This HVAC system was first drawn in 3D and inserted into the customer's federated model to ensure there would be no interference with other trades. The 3D fittings were then laid out in 2D and sent to the shop floor for fabrication and assembly. Once completed, the duct work and all corresponding accessories were packaged in wooden crates and loaded into sea-cans for shipment by land and sea.
Documents
Layout Drawing - (565 KB File) | |
Fabrication - (2,028 KB File) | |
Quality Assurance - (170 KB File) | |
Packing Lists - (2,449 KB File) | |
Install Drawing - (655 KB File) | |
Crating & Containerization - (1,578 KB File) |